Project Materials


The staff report for the October 8, 2025, Site and Architectural Commission is now available.

In the Revised Adoption Draft attached to the staff report, there are two changes from the original Adoption Draft. These changes are identified by their page number in the track changes version of the document. They are highlighted in the document itself.

  • Page 5: The reference to the “2024 Los Angeles area fires” is revised to “2025 Los Angeles area fires” to fix a typo.

  • Page 16: Additional text describing the methodology for identify SB 99 parcels with only one egress is added.

Adoption Draft of the Health & Safety Element

The documents below will be updated as the General Plan Update progresses.

  • Policy Framework

  • Public Review Draft General Plan Update

  • Adoption Draft General Plan Update

  • Final Adopted General Plan

  • Environmental Documentation (as appropriate)